BACK

B.             CATALYTIC DEVELOPMENT SCHEMES

 Central silk Board has been implementing central sector and centrally sponsored schemes for the development of sericulture with the involvement of the State Government. These schemes have been collectively prescribed as Catalytic Development Programme (CDP). Some of the problems faced in implementation of the programme during IX plan have been addressed before finalizing the programme for the X plan period, while the overall objective of the programme is to ensure coordinated effort to support sericulture at all stages of value addition.

 MULBERRY SECTOR

 1.         SUPPORT FOR RAISING NURSERIES OF HIGH YIELDING MULBERRY VARITIES

The objective of the scheme is to help State Government to produce saplings of high yielding mulberry verities from Kissan nurseries raised by farmers for supply to new farmers and sericulturists who wish to re-plant their farm with the improved varieties.

 COST SHARING

CSB

State

Beneficiary

50%

50%

---

 2.     ON-FARM TRAINING AND START-UP TOOLS TO NEW MULBERRY SERICULTURISTS

·        The objective of the scheme is to help farmers to take up sericulture on scientific lines and equip them with essential tools /equipments to embark on mulberry farming and rearing of silkworm & to improve quality and productivity of cocoons through adoption of scientific packages of practices in mulberry cultivation and silk worm rearing.

 ·        The unit cost is Rs. 2000 per acre – Rs. 1750/- for supply of tool kits and Rs. 250/- for providing stipend to farmers for one month training (if area of mulberry is less than one acre, cost of tool kit would be Rs. 900/- and Rs. 250/- stipend for one month training).

 3.     REARING APPLIANCES AND FARM EQUIPMENT TO FARMERS (FOR BIVOLTINE SILKWORM REARING)

 ·        The objective of the scheme is to assist the farmers in purchasing modern tools and equipment which make mulberry cultivation and rearing more efficient and convenient & to encourage more farmers to take up Bivoltine sericulture successfully with the help of modern tools, machinery and equipment.

 COST SHARING

CSB

State

Beneficiary

25%

25%

50%

 List of Rearing Appliances /Farm Equipments

A)                General Farmers

Sl. No. Item
1 Rearing Trays (Plastic)
2 Incubation Frame
3 Nylon Net
4 Bed Disinfectant
5 Paraffin Paper
6 Hygrometer
7 Egg carrying bag / box
8 Duster

B)                 Bivoltine Farmers

Sl. No. Item
1 Rotary mountages
2 Shoot rearing rack
3 Nylon nets
4 Pruning saw
5 Secateur

4.       ASSISTANCE FOR INSTALLATION OF DRIP IRRIGATION SYSTEM

Sl. No.

Area (ha)

Prorata unit cost @ Rs. 48,000/- per ha. / Beneficiary

Prorata subsidy ceiling at Rs. 24,000/- per ha. / Beneficiary

Eligible subsidy for SC/ST /Women and general category who own les than 1 ha. Plantation.

90% of unit cost (SC/ST/Women)

70% of unit cost (others)

1

1.0

48,000/-

24,000/-

24,000/-

24,000/-

2

0.6

28,800/-

14,400/-

24,000/-

20,160/-

3

0.4

19,200/-

9,600/-

17,280/-

13,440/-

4

0.2

9,600/-

4,800/-

8,640/-

6,720/-

COST SHARING

CSB

State

Beneficiary

45%

5%

50%

5.       SUPPORT FOR USE OF QUALITY DISINFECTANTS

 COST SHARING

Category

CSB

State

Benefeciary

F1 Farmers

25%

25%

50%

P1 Farmers

50%

50%

----

DISINFECTION MODULES

Sl. No.

Item

Quantity

1 Bleaching Powder

8.790 Kg.

2 Slaked Lime

2.171 Kg.

3 Uzi trap

10 nos.

4 Sanitech (Chlorine Dioxide)

4 lts.

5 Bed disinfectant

5.000 Kg.

 6.         ASSISTANCE TO FARMERS FOR CONSTRUCYION OF REARING HOUSE

 COST SHARING

CSB

State

Beneficiary

25%

25%

50%

 7.       CHOWKI REARING CENTRES – ASSISTANCE TO QUALITY SERVICE CLUBS /NON-GOVERNMENT ORGANISATIONS /SELF-HELP GROUPS FOR CONSTRUCTION OF CHAWKI REARING BUILDING AND PROCUREMENT OF CHAWKI REARING EQUIPMENT 

COST SHARING

CSB

State

Beneficiary

25%

25%

50%

List of Equipments for Chawki Rearing Center

Sl. No. Item
1 Microscope
2 Plastic Rearing Tray (Size 31x41)
3 Temperature & Humidity Recorder
4 Heater with thermostat
5 Humidifier
6 Power Sprayer
7 Mask
8 Incubation frames (Plastic)
9 Leaf collecting baskets
10 Chopping board + knives
11 Cleaning nets for chawki
12 Bottom stands
13 Feeding stands
14 Leaf chopping machine
15 Flame gun + cylinder
16 Hand duster
17 Litter basket
18 Plastic basins
19 Wash basins
20 Secateurs
21 Egg carrying box / bag
22 Ant wells
23  Foot mats

8.       CROP INSURANCE SUPPORT - MULBERRY

·        The objective of the scheme is to cover the risk of crop losses faced by farmers who have not had much experience in rearing Bivoltine silkworms.

COST SHARING

CSB

State

Beneficiary

40%

40%

20%

9.       SUPPORT FOR UPGRADING EQUIPMENT IN EXISTING STATE / PARASTATAL / CO-OPERATIVE OWNED SEED PRODUCTION AND REELING UNITS:

COST SHARING

CSB

State

Beneficiary

50%

50%

--

List of Equipments for up-gradation of infrastructure in seed production and reeling units

Sl. No.

Name of the Equipment

  Silkworm Seed Production Centre

A. General Equipments

1 Cocoon /Pupae preservation plastic trays
2 Plastic oviposition trays
3 Plastic seed cocoon transportation crates
4 Plastic male moth preservation trays
5 Room heaters
6 Humidifier /Air coolers
7 Egg preservation cabinet
  B. Machineries
1 Electric balance
2 Power sprayer
3 Generator (Mini)
4 Incubators
5 Platform weighing balance
  C. Testing & Treatment Equipment
1 Moth examination table
2 Moth crushing Mixi
3 Centrifuge
4 Cyclomixer
5 Microscopes
6 Deflossing Machine
7 Loose egg preparation table
8 Acid treatment bath
  Reeling Units
1 Cocoon driers (Hot air drier or ushnakot)
2 Cocoon sorting table
3 Cocoon storage racks
4 Circular pressurized cooking machine
5 Two pan cooking unit
6 Cocoon cooking cages and pressing disk
7 Multiend Reeling Machine
8 Re-reeling machine (closed type)
9 Silk examination stand
10 Small skeining machine
11 Long Skeining (book) machine
12 Long skein stand
13 Small skein book press
14 Small reel permeation chamber
15 Denier scale
16 Single cocoon reeling epprouvette.
17 Balances – 2 (one 0.001 grams to 100 grams and one 5 kg. cap
18 Boiler
19 Water softening soil plant

AT A GLANCE  -  DIFFERENT MICRO-PROJECTS UNDER VANYA SECTOR’S CDP FOR XI PLAN – UNIT COST & SHARING PATTERN

 

 

Sector

 

Name of the Scheme

Unit Cost

(In Rs.)

Sharing

General States

Special States

CSB

State

Benf.

CSB

State

Benf.

 

 

T  A  S  A  R

 

 

 

 

 

Seed

1. Assistance to Private Tasar Graineurs.

100000.00

60%

20%

20%

80%

10%

10%

2. Assistance to strengthening of Tasar Seed Multiplication Infrastructure.

250000.00

50%

50%

-

90%

10%

-

3. Assistance to Tasar Seed Rearers.

7,500.00

60%

20%

20%

80%

10%

10%

 

Cocoon

4. Support to Tasar Seed/ commercial rearers for raising and maintenance of systematic plantation of food plants and supply of rearing equipments / raising & maintenance of chawki Garden.

 

16000.00

 

60%

 

20%

 

20%

 

80%

 

10%

 

10%

5. Assistance for construction of Cocoon Storage Houses in Tasar Sector.

 

50000.00

50%

25%

25%

50%

25%

25%

 

E  R  I

 

Seed

1. Assistance to State Deptts. for strengthening of existing Eri Farm Cum Grainages.

500000.00

50%

50%

-

90%

10%

-

 

Cocoon

2. Support for Castor/Tapioca cultivators wit start up tools. 

1050.00

60%

20%

20%

80%

10%

10%

3. Augmentation of perennial Eri food plants with supply of start up tools.

10000.00

-

-

-

80%

10%

10%

4. Construction of Eri Rearing Houses.  

50000.00

60%

20%

20%

80%

10%

10%

AT A GLANCE  -  DIFFERENT MICRO-PROJECTS UNDER MULBERRY SECTOR’S CDP FOR XI PLAN – UNIT COST & SHARING PATTERN

 

 

Sector

 

Name of the Scheme

Unit Cost

(In Rs.)

Sharing

General States

Special States

CSB

State

Benf.

CSB

State

Benf.

 

M U L B E R R Y

 

 

Mulberry

 

 

 

 

Seed

1. Support for upgrading existing seed    / grainage units under Mulberry.

10,00,000

60%

20%

20%

80%

10%

10%

2. Support to establish large scale Bivoltine seed production grainage in Public/Pvt. Sector.

100,00,000

60%

20%

20%

80%

10%

10%

3. Assistance for Seed Testing Facilities in Public/Pvt. Grainages ( for quality seed production).

2,50,000

60%

20%

20%

80%

10%

10%

4. Asst. for mulberry silkworm seed production unit.

P1

100,00,000

60%

20%

20%

60%

20%

20%

P2

50,00,000

60%

20%

20%

60%

20%

20%

 

Cocoon

5. Support for Mulberry plantation development.

5,500

50%

25%

25%

80%

10%

10%

6. Assistance for irrigation and other Water Conservation &  usage techniques.

50,000

50%

25%

25%

80%

10%

10%

7. Supply of rearing appliance/ farm equipments to BV. Farmers.

40,000

50%

25%

25%

80%

10%

10%

8. Supply of disinfecting materials & other crop protection measures for BV. Farmers.

3,000

25%

25%

50%

80%

10%

10%

9. Asst. for construction of Rearing Houses(RH).

 

1,50,000

1,00,000

50,000

 

25%

 

25%

 

50%

 

80%

 

10%

 

10%

10. Asst. for maintenance of chawki garden, construction of CRC buildings and supply of  chawki rearing equipments.

3,45,000

25%

25%

50%

80%

10%

10%

11.Setting up of Production Units for Biological inputs.

 

Lump-sum

50%

50%

-

90%

10%

-

12. Assistance for Farmers Training.

1,00,000

50%

50%

-

90%

10%

-

13. Door to Door Service Agents for Disinfection and inputs supply and

       Assistance for Sericulture Poly-Clinics.

 

Lump-sum

 

1,00,000

50%

 

50%

50%

 

50%

-

 

-

90%

 

90%

10%

 

10%

-

 

-

14. Insurance support.

Demand dependent

50%

25%

25%

80%

10%

10%

AT A GLANCE  -  DIFFERENT MICRO-PROJECTS UNDER SUPPORT SERVICE SECTOR’S CDP FOR XI PLAN – UNIT COST  & SHARING PATTERN

 

 

Sector

 

Name of the Scheme

Unit Cost

(In Rs.)

Sharing

General States

Special States

CSB

State

Benf.

CSB

State

Benf.

 

SUPPORT SERVICE

 

 

 

 

Support Services

1. Product Design and Development Generic Promotion of Indian Silks/Sericulture (including exhibitions, buyer-seller meets. Etc.)

 

-

100%

-

-

100%

-

-

2. Vanya Silk Market Promotion Cell.

-

100%

-

-

100%

-

-

3. Entrepreneurship Development & Management Development Programmes.

 

-

(100 Prog.)

100%

-

-

100%

-

-

4.  Beneficiary Empowerment Programme conducted by States  and Seri related exposure visits.

 

5,000

100%

-

-

100%

-

-

5. Publicity for the sector (Audio visuals / printing / exhibitions / awareness progs. / workshop / seminars etc.)

 

Demand Dependant

100%

-

-

100%

-

-

6.  Assistance to NGOs/SHGs & Agencies other than CSB & State for meeting administrative expenditure towards Project Implementation in the Vanya sector and in the Mulberry sector.

 

-

100%

-

-

100%

-

-

7. Women Development Components.

 

-

100%

-

-

100%

-

-

8. Emphasis on Tribal areas.

 

-

100%

-

-

100%

-

-

9. Assistance towards studies / consultancies / surveys / monitoring / supervision / evaluation etc.

 

-

100%

-

-

100%

-

-

 

 

 

AT A GLANCE  -  DIFFERENT MICRO-PROJECTS UNDER POST COCOON  SECTOR’S CDP FOR XI PLAN – UNIT COST

& SHARING PATTERN

 

 

Sector

 

Name of the Scheme

Unit Cost

(In Rs.)

Sharing

General States

Special States

CSB

State

Benf.

CSB

State

Benf.

 

POST COCOON

 

 

 

SUPPORT SERVICE

 

1. Popularization of new Slow-speed Certified Multi-end reeling machines (20 end per basin) : 

 18 – basin equivalent to 360 ends :

40,00,000

50%

25%

25%

-

-

-

2. Support for establishment of Certified Multi-end Reeling Machines(10 ends per basin)   :           10 Basins

                                                                               20 Basins

 

10,00,000

17,00,000

 

50%

 

25%

 

25%

 

80%

 

10%

 

10%

3. Establishment of automatic / semi automatic Reeling Units (Imported).

100,00,000

50%

25%

25%

-

-

-

4. Support for establishment of Improved Cottage Basin Reeling Units.

2,50,000

50%

25%

25%

80%

10%

10%

5. Support for existing Charkha Reeling Units to dissuade child labour(Motorized Charkhas).

10,000

50%

25%

25%

80%

10%

10%

6. Support for setting up of Certified Dupion Silk Reeling Units( 10 kgs/20 kgs. – prorate basis).

2,00,000

50%

25%

25%

80%

10%

10%

7. Support for Hot Air Driers – electrical /       50 Kgs.

multi-fuel / ushnakotis for reeling Units.       100 Kgs.

1,00,000

1,75,000

50%

25%

25%

80%

10%

10%

8. Assistance  for Twisting Units.( 400 spindles)

6,00,000

75%

-

25%

80%

10%

10%

9. Support for establishment of Pupae Oil Extraction Production and Bye-product utilization Units.

14,00,000

75%

-

25%

-

-

-

10. Incentive for production of Bivoltine Silk.

100/- per kg.

50%

50%

-

90%

10%

-

11. Quality linked price support system for cocoons and raw silk – for State Govts. / Co-op./NGOs/SHGs.

60,00,000

75%

25%

-

90%

10%

-

12. Establishment of Cocoon Banks/Market support to Vanya Sector – RMBs for Tasar, Eri & Muga.    

100,00,000

75%

25%

-

90%

10%

-

13. Providing services of Mastar Reelers/weavers/ Dyers units-through / for State Govt./NGO/SHGs/Co.op.

75,000

100%

-

-

100%

-

-

14. Support for Vanya Reeling /     Spinning :

Spinning Sector.                               Reeling  :

 

3,800

16,000

 

50%

 

25%

 

25%

 

80%

 

10%

 

10%

 

 

 

 

 

15. Support for establishment of Spun/Spinning Mills.

170,00,000

50%

25%

25%

65%

25%

10%

16. Support for establishing shuttle-less looms (each unit with 8 looms and 1 sectional warping machine).

 

50,00,000

50%

25%

25%

-

-

-

17. Support for Handloom Sector for Loom upgradation:

i) Support for Certified Handlooms specially designed for silk [ parallel beat-up / swing beat-up, negative let off, 5-wheel take up, separate cloth ruler along with Jacquard(240 hooks) ]

 

28,000

 

50%

 

25%

 

25%

 

80%

 

10%

 

10%

ii) Loom upgradation through Jacquards ( or Dobby / Pneumatic lifting mechanism / Ball to beam conversion device etc.)

10,000

50%

25%

25%

80%

10%

10%

iii) Computer Aided Textile Designing (CATD)

 

5,00,000

50%

25%

25%

80%

10%

10%

18. Support for setting up of Common Facility Centre for yarn dyeing / fabric processing :

a) Yarn Dyeing : 25 kg. capacity.

3,00,000

75%

-

25%

80%

10%

10%

b) Yarn Dyeing : 50 Kg. capacity.

5,00,000

75%

-

25%

80%

10%

10%

c) Arm Dyeing : 50 capacity.

12,00,000

75%

-

25%

80%

10%

10%

d) Fabric Processing Facilities.

25,00,000

75%

-

25%

80%

10%

10%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CHARACTERS OF DIFFERENT ECO-RACES OF TASAR COCOONS

 

 

 

Race

 

State

 

Voltinism

Single cocoon Wt.(g.)

Single shell Wt.(g.)

Filament length (m.)

Average Denier

Reelability %

Recovery of Silk from 1000 cocoons (g.)

No. of cocoons required for 1 Kg. silk

DABA

 

Bihar

Bi.

12-14

1.45-2.0

850-1200

10

62-65

750-1000

1000-1280

RAILY

Madhya Pradesh

Uni./Tri.

15-18

2.5-3.0

1400

10

62

1500

650-800

SUKINDA

 

Orissa

Tri.

12

1.0-1.45

850

10

62-65

750-1000

1000-1200

BOGAI

 

Orissa

Bi. – Tri.

10

1.3-1.4

700

8

62

750

1350

SARIHAN

 

Bihar

Tri.

8

0.7-0.8

570

8

61

440

2280

BHANDARA

 

Maharashtra

Tri.

8.5

0.8-0.9

670

7

60

450

2220

ANDHRA LOCAL

Andhra Pradesh

Bi.

8

0.9-1.0

600-650

8

65

550

1750

MODAL

Orissa

Bi.

15-18

3.0-4.0

1400-1600

10-11.5

62

1800

550

LARIA

 

Bihar

Bi.

7-9

0.8-1.0

550-650

7-8

60

550

1900

A.PROYELI

 

NE/NW

Bi.

5

0.4-0.6

400-500

4-4.5

60-65

200-250

4000-5000