C. ASSAN & ARJUN PLANTATION SCHEME UNDER NFFWP

RAISING OF SAPLING (76,400 NOS) FOR 20 HA ASAN & ARJUN PLANTATION  

Sl no

Particular

Size

Man Days

Minimum wage / MD (Rs)

Total amount (Rs)

1

2

3

4

5

6

1 Leveling and preparation of bed 55 beds of 20’X4” size each 76 60 4560
2 Cost of Arjun seed and bag 22 bags @ 5000/bag 22 60 1320+220
3 Soaking, Heap making including mixture of cowdung 1,10,000 11 60 660
4 Filling of Ploythene 76400 @0.10/ploythene or 128 MD - 7680

 

5 Mixture of cowdung, sand and earth 76400 sapling 44 MD - 2640
6 Rooting media FYM 5.5 truckload @ 1400cft/TL - - 7700
7 Screening and sorting of germinated seeds - 100 - 6000
8 Shed preparation over nursery and green fencing - 55 - 3300
9 Pot watering including tin, sprinkler, etc. - 270 - 16200
10 Weeding and gap filing 76400 packet 54 - 3240
11 Cost of polythene 131 kg @ Rs.95/kg - - 12445
12 Transportation of filled polythene to bed - 40 - 2400

 

13 Cost of Dursban 3.5 lit @ Rs.315/lt - - 1103
14 Cost of Urea 10kg - - 50
15 Contingencies - - - 447
  TOTAL - 800 MD   70,000/-

 COST OF RAISING ASAN AND ARJUN PLANTATION 1 HA WITH SPACING 1.2 X 1.2 MT (0.1 HA) & 1.8 X 1.8 MT (0.9 HA) 

Sl no

Particular

Size

Man Days

Minimum rate (Rs)

Total amount (Rs)

1

2

3

4

5

6

1 Digging of pits 1’ x 1’ x 1’

3472 pits

63 60 3780
2 Filling of pits 3472 32 60 1920
3 FYM/Compost including transportation charges 1 TL (200 cft)

-

1400 / TL 1400
4 Cost of Dursban 200 ml

-

315/lt 63
5 Transportation from nursery bed to pit site 3280 11 (@ 350 seedling/md) 60 660
6 Cultural operation i.e. Cleaning, application of compost, Dursban, weeding, hoeing, watering, watching, etc.

-

26 60 1560
7 Contingencies

-

-

-

157
8 Trench fencing

-

91 60 5460
  TOTAL   223   15000

 MAINTENANCE COST PER HA / YEAR OF

ASAN AND ARJUN PLANTATION DURING 2ND AND 3RD YEAR

 

Sl no

Particular

Size

Man Days

Minimum rate (Rs)

Total amount (Rs)

1

2

3

4

5

6

1 Cost of FYM/compost 1 Truck Load (200 CFT) - 1400 1400
2 Cost of Dursban 200 ml - 315/lt 63
3 Cost of fertilizer `      
Nitrogen Urea 85 Kg   5/kg 425
Phosphate SSP 80 kg - 4/kg 320
Potash MOP 20 kg - 4/kg 80
4 Cultural operation        
Basin making - 13 60 780
Fertilizer application - 10 60 600
FYM application - 15 60 900
5 Contingents - - - 132
  TOTAL   32 - 4700.00